The Montana Department of Transportation has released the final report for “Investigation of Prefabricated Steel Truss/Bridge Deck Systems,” a WTI and MSU Civil Engineering project led by Damon Fick, Tyler Kuehl, Michael Berry, and Jerry Stephens. The study evaluated a prototype of a welded steel truss constructed with an integral concrete deck, which has been proposed as a potential alternative for accelerated bridge construction (ABC) projects in Montana. Steel truss bridges are relatively light weight compared with plate girder systems, which makes them a desirable alternative for both material savings and constructability. The full report and a summary report are available on the MDT website. Additional project information is available on the WTI website.